What is mechanical completion in projects?
As used in project finance, occurs when all mechanical and physical aspects of a project, except for punch list items, have been constructed and installed in accordance with the specifications set out in the construction contract.
What is mechanical completion in construction?

Mechanical completion means that the facility is physically complete, except for a few punchlist items. The plant can be turned on safely and is ready for performance testing.
What is mechanical completion and what is its significance?
Mechanical Completion is the point in the project when construction is complete and subsystems are ready to be handed over to the commissioning team. There can be many mechanical completion milestones defined for the various subsystems of the project.
What does substantially complete mean in construction?
Substantial completion means the project, or a portion of the project, is fit for its intended use. The owner can then occupy and use the property. The owner must also pay the contractor the last portion of the monies owed for that project or portion of the project.

What is the difference between pre-commissioning and completions?
Pre-commissioning is an important part of the commissioning process. If not done properly, small issues can become much bigger issues later in the project. Handover from the construction team to the commissioning team precedes pre-commissioning, and it is called mechanical completion.
Is pre-commissioning part of mechanical completion?
sometimes pre-commissioning activities are included into mechanical completion. It also ensures the closing of columns, vessels, drums, tanks, final restoration of systems or subsystems after cleaning, air tightness or leak testing of systems, lubricants application, etc.
What does project completion mean?
The project conclusion describes the successful achievement of the project goal. It includes the final phases of a project: product acceptance, a final analysis, experience assurance and the final project resolution. These points are summarized in the project conclusion report.
What is the difference between mechanical completion and pre-commissioning?
In Mechanical completion phase all machines, all equipment and site construction are inspected and tested to validate that the installation is in line with approved drawings, specifications and ready for pre-commissioning or commissioning in safe manner. It also confirms the compliance of project requirement.
What is project completion in construction?
Construction Completion or Completion of Work – Construction completion is when all work is complete, including punch list items, final cleanup, demobilization and submittal of final documentation, in accordance with the contract documents.
What is the final completion in construction?
As used in project finance, occurs when: The project has achieved all the technical and performance requirements set out in the construction contract. All punch list items have been completed (unless the parties otherwise agree).
What is mechanical completion certificate?
A Mechanical Completion Certificate (MCC) is an owner’s acceptance certificate issued to a contractor when the contractor completes or achieves the requirements of Mechanical Completion (M/C) criteria in accordance of the contract. (
What is mechanical commissioning?
The commissioning process (often referred to as “acceptance testing”) includes achieving, verifying, testing, accepting, and documenting that the performance of mechanical systems meets design intent and the owner and occupant needs.
How do you write a project completion report?
Here is a list of steps to help you create a closure report for your next project:
- Label the document.
- Write an overview of the project.
- Describe the project’s accomplishments, outcomes and results.
- Describe the project’s scope.
- Craft a project performance analysis.
- Highlight challenges and risks that developed.
What is project completion criteria?
Completion criteria are the criteria by which you or anyone else can determine if a task was completed properly. Completion criteria can be a simple checklist or a more comprehensive set of standards or protocols.
What is commissioning of mechanical?
What must be done in the project completion?
The key activities in project completion are gathering project records; disseminating information to formalize acceptance of the product, service, or project; and performing project closure. As the project manager, you will need to review project documents to make certain they are up-to-date.
What is the project completion date?
Project Completion Date means the date specified in the agreement on which the Scope of Work will be fully completed. This term is only used in loan agreements.
What is MCC in project management?
Mechanical Completion Certificate (MCC) – The Project Definition. Project Management.
What is the difference between pre commissioning and completions?
What are the 7 steps to closing a project?
7 steps to closing a project
- Formally transfer all deliverables. The first step to closing out your project is to finalize and transfer the project deliverables to the client.
- Confirm project completion.
- Review all contracts and documentation.
- Release resources.
- Conduct a post-mortem.
- Archive documentation.
- Celebrate.
How do you write a project completion letter?
Dear [Insert name], We are pleased to inform you that we have been able to complete the construction work before the final completion date of [Insert final completion date]. We signed the contract of construction works that began on [Insert beginning date] and ended on [Insert end date].
What are the six 6 steps to ensure successful project completion?
6 Steps To Ensure Successful Project Completion
- Step 1: Study the project thoroughly.
- Step 2: Prepare a concrete project plan.
- Step 3: Daily monitoring of work assigned after project begins.
- Step 4: Keep the client informed on a predetermined basis.
- Step 5: Perform testing at regular intervals.
- Step 6: Final project delivery.
What are the steps in completing a project?
Project Management Basics: 6 Steps to a Foolproof Project Plan
- Step 1: Identify and meet with stakeholders.
- Step 2: Set and prioritize goals.
- Step 3: Define deliverables.
- Step 4: Create the project schedule.
- Step 5: Identify issues and complete a risk assessment.
- Step 6: Present the project plan to stakeholders.
What are the steps in commissioning process?
Construction Phase: Installation, Startup and Testing
- Review submittals of commissioned equipment and controls.
- Participate in factory witness testing for major components of the system.
- Ensure proper equipment installation prior to startup.
- Witness vendor startup of critical equipment.
What are the design and fabrication related mechanical engineering projects?
Design and Fabrication Related Mechanical Engineering Projects: Design and fabrication related Projects include designing a mechanism,machine and fabricating by using different manufacturing Processes like welding, machining,laser cutting. Design and Fabrication Of Gear and Spline Cutting Attachment for Lathe
What are mechanical completion and substantial completion?
Mechanical completion, substantial completion, and final completion are important steps to understand during the commissioning process, since they are important to keep the work organized and to achieve contract commercial milestones of the project.
What is the difference between mechanical completion and Mechanical piping?
Instead, mechanical completion of the electrical distribution system may be separate from mechanical completion of the mechanical piping system (as an example) so that commissioning can proceed while other areas of the plant continue to be installed.
What document deliverables are required at mechanical completion?
The physical installation is confirmed complete at mechanical completion, as well as the associated documentation. The document deliverables required at mechanical completion are the O&M manuals and as-built drawings.