How long does it take to build the pool?
between 8 and 12 weeks
Most pool projects take, on average, between 8 and 12 weeks, depending on the scope of the project. But many factors can affect your pool building timeline, including the time of year you plan to build among other things.
How long does it take to put an inground pool in?
Although many variables impact installation time, the average for a backyard pool is about six to 12 weeks. To help you estimate and plan, we’ve detailed the main steps involved in the pool-building process and the estimated time needed for each.
How long does it take to excavate a swimming pool?
Excavation: 1-4 days Average jobs take one or two days for pool excavation to be completed. However, complications need to be considered as well. Access restrictions, weather, utility obstructions, and the potential for hitting rock can add to this timeline.
How long before you can swim in a new pool?
After you shock the pool — As soon as your chlorine levels reach 5 ppm or lower, it’s officially safe to swim. Depending on the type of shock used, as well as the amount used, it can take anywhere from 24 hours or even up to a couple of days.
What is the best time of year to install a pool?
If you want your pool to be ready for the summer, opt for a spring installation. However, if you want the best price, build your pool in the fall or winter. Be sure to weigh all of your options and make a decision that is best for you.
How long does it take to excavate a pool?
What are the stages of building a pool?
Upon signing of your contract, you will be delivered a custom schedule and detailed/customized plan for the process of your pool build.
- Step 1: Layout & Design.
- Step 2: The Dig.
- Step 3: Steel Installation.
- Step 4: Plumbing & Electrical.
- Step 5: Shotcrete.
- Step 6: Tile and Decking.
- Step 7: Interior Finish.
- Step 8: Pool Start-Up.
Can I swim in a freshly filled pool?
Wait about 20 minutes after adding balancing chemicals to your newly filled pool, and you should be good to swim. Calcium chloride – If you have hard water issues, it’s advised to wait about 2-4 hours before swimming after adding calcium chloride to soften your pool’s water—or until one filter cycle has been completed.
How soon can I fill my pool after plastering?
How Long Should I Wait Before Using the Pool After Plastering? Unlike ordinary plaster which needs to dry completely first, pool plaster works differently. One the plaster dries out; you need to fill the pool with water. The plaster material cures under water in about 7-10 days.
How long does a concrete pool need to cure?
Concrete, when applied using the shotcrete process, or cast-in-place, needs to cure for 7 days. Water is the best curing method (7 continuous days).
How long does it take to dig out a pool?
Why is my newly filled pool green?
Your first instinct when you fill your pool with new water, is to shock it. But that shock then oxidizes the metals, that chemical reaction then causes the green hue in your water. This is common with refills that used well water or even water that hasn’t been shocked but instead contains a high level of metals.
How long do you have to wait to swim in a new pool?
What is the best month to buy a pool?
FALL: SEPTEMBER – NOVEMBER Most pool retailers have a pretty good feel for the market demand and order what they are going to need for the season. In most cases, by the end of September, they’re out of stock and have already placed their order for the next season.
Does a pool house count as square footage?
Finished areas also only count toward your total square footage if they’re attached to your home. Pool houses, sheds, and garages can all be listed separately, but they can’t go toward your actual house’s overall square footage if they aren’t attached.
Stage 1 – The first stage is to figure out the design that you want for your pool.
How long does it take to build an average pool?
Pool Builders Offer Realistic Timelines for Swimming Pool Construction. Most pool projects take, on average, between 8 and 12 weeks, depending on the scope of the project. But many factors can affect your pool building timeline, including the time of year you plan to build among other things.
How long does it take to build an inground pool?
Most pool projects take, on average, between 8 and 12 weeks, depending on the scope of the project. But many factors can affect your pool building timeline, including the time of year you plan to build among other things. If you wait until the busy summer season, you may end up waiting longer than anticipated to enjoy your new pool.
How long does it take to install a pool?
The Short Answer. The time it takes to build a pool, from excavation to completion, depends on a lot of factors. However, the biggest factor is the type of pool. Here are some general guidelines: For Concrete Pools, 4-6 Weeks. Concrete pools take the longest to install, mainly because everything has to be done onsite.